Get the scope in writing
The contract documents should define the work and the responsibilities assigned to each party.
Review the projectDrawings, scope, site conditions, and the questions your team needs to answer.
Separate building design from precast design
Distinguish the building concept and performance criteria from panel details, connections, and delegated work.
Delegated design is a design portion assigned by the contract documents to a specialty engineer or supplier, subject to the project team’s defined review.
Coordinate openings, embeds, and connections
Assign each detail and trade interface before the production drawings are finalized.
A clear assignment helps the team review the right detail at the right time.
Set the review path
State what each review covers, who approves it, and how conflicts are resolved.
The review path should match the project contracts, code responsibilities, and design team structure.
Review open items
Bring unresolved scope and coordination questions into the project review.
Start with the documents and questions in front of your team.